The client offers architectural and construction management consulting services to some of the largest commercial and industrial construction companies in the client is a major construction company based in Toronto, specializing in residential construction projects across the Greater Toronto Area (GTA) and in other cities across Ontario. With a legacy of more than four decades, the client has successfully executed condominiums, gated community projects, and other large-scale residential projects, providing housing for more than a million residents.
The client managed more than 3 projects simultaneously. Like in the case of every major construction project, they had to operate several pieces of heavy equipment. Since most of the equipment they used was company owned, they had to take care of the maintenance themselves.
However, they were struggling to keep track of the maintenance schedules of every piece of individual equipment. As a result, equipment failures were becoming frequent, leading to downtime and project delays. Lack of effective maintenance also compromised the life of the equipment in some cases.
Therefore, the company was looking to establish a smarter preventive maintenance system, where they could detect and track issues before they resulted in equipment failures.
After we engaged with the different stakeholders and analyzed the problem, we were able to conceptualize a solution that combined the capabilities of Microsoft SharePoint and Power Platform to simplify preventive maintenance and make it more effective.
We decided to use Power Automate and Power Apps for the system.
Power Apps allowed us to build a low-code application where their site teams can log in the hours each piece of equipment was used. If any issues were detected with any equipment, then the field time could also file a report for the same using the Power Apps application.
Power Automate, the low-code automation platform from Microsoft, was also used to automate critical tasks, thereby saving time, reducing errors, and facilitating quick actions.
As soon as any logs or issues were submitted, Power Automate automatically created an entry in the respective SharePoint folder by extracting all the necessary information.
If certain actions needed approval from the management, then Power Automate immediately raised the request and sent automatic notifications to the relevant members of the time.
SharePoint served as the backbone of the entire system. All the data entered by the field teams through the Power Apps application was stored in the SharePoint document libraries. A folder structure was maintained with separate folders for issues detected and work hours logged for each machine.
Proper permissions were also configured so that the information stored in the SharePoint library can also be accessed by the right personnel.
Here is a brief overview of the process that we followed to successfully implement the solution:
After deploying the solution, the client was able to significantly improve their maintenance processes. The work hours of every single piece of equipment were tracked efficiently. This allowed the maintenance team to determine which machine needed maintenance and when.
As soon as any serious issue was detected, the automated system immediately notified the relevant personnel. This made it easier for the team to take preventive actions on time and prolong the life of the equipment.